论文部分内容阅读
“老宋,这边的网片搭接部分低于100公分,你赶快整改一下,还有,那边网片搭接铁丝扭结间距超过了300公分,再加一道铁丝,必须保证搭接部位的连接强度!”“哎呀,老王,你咋抠这么紧,你看,这可没差多少,再说咱们施工的巷道条件好……”7月1 9日8点班,中国平煤神马集团梨园矿宁庄井井下东翼山上探巷,验收员王留照例行工程质量检查时,发现迎头刚施工的巷道网片搭接没按标准执行,立即要求掘进工宋志强停工整改。
“Lao-song, here’s part of the mesh lap less than 100 cm, you quickly rectification, and there, the mesh lap wire twisted kink more than 300 cm apart, plus a wire, you must ensure that lap joints Oh !, Pharaoh, you pull so tight, you see, this is not much difference, let’s talk about the construction of the tunnel conditions are good ... ”July 9 at 8 o’clock, China Ping Coal Shenma Group Liyuan Mine Ningzhuang wells on the eastern wing of the mountain exploration Lane, inspectors Wang stay as routine engineering quality inspection found that the first just construction of roadway lap lap did not follow the standards, and immediately asked excavator Song Zhiqiang suspended work rectification.