2001年建成通车的位于荷兰鹿特丹港的Dintelhaven桥,为主跨185 m的三跨连续刚构桥。该桥首次在大跨度预应力混凝土箱梁桥中,采用碳纤维材料(CFRP)为体外预应力筋。全桥使用了4根长度为75 m的CFRP体外预应力束。每根CFRP体外预应力束则由91根直径为5 mm的CFRP筋组成。该文根据相关资料重点介绍了设计及建造该桥时,与CFRP体外束有关的短期和长期荷载性能试验情况,以及CFRP体外束的锚具开发研究和设计构造细节的处理特色。
Built in 2001, the Dintelhaven Bridge in Rotterdam, the Netherlands, is a three-span continuous rigid frame bridge spanning 185 meters. For the first time, the bridge is made of CFRP in vitro prestressed tendons in long-span prestressed concrete box girder bridges. Four full-length CFRP in-vitro prestress beams were used for the full bridge. Each CFRP external prestressing bundle consists of 91 CFRP bars with a diameter of 5 mm. Based on the relevant information, the article highlights the short-term and long-term load performance tests related to CFRP in vitro design and construction of the bridge, as well as the characteristics of the CFRP in vitro beam anchorage development and design details.