目前,我国重型机床制造厂普遍存在严重拖期交货现象。而部装交货在很大程度上缓解了这一矛盾。它是根据重型机床部件外形尺寸大、重量吨位高的特点,改变传统的总装交货为部装交货,变两次总装拆卸为一次安装。缩短了交货期、降低了制造成本,给机床制造厂家和机床用户带来双赢。
At present, China’s heavy machinery factory widespread serious delays in the delivery. The Department of delivery to a large extent alleviate this contradiction. It is based on heavy machine parts dimensions, weight, tonnage characteristics, the change of the traditional assembly and delivery for the delivery of parts, change the assembly and disassembly twice as a total installation. Shorten the delivery time and reduce manufacturing costs, to machine tool manufacturers and machine tool users a win-win situation.