兖州矿业(集团)公司第三十七工程处在济宁三号煤矿选煤厂的德国动筛跳汰机设备安装施工中,找寻最佳安装顺序和工艺,所有部件就位顺利,达到安装精度要求,设备调试一次成功。德国KHD.ROMJIG型选煤动筛跳汰机为梭式水槽型跳汰机,单重48 t,共2台。安装在选煤厂动筛车间+13.100 m标高层
The 37th Engineering Department of Yanzhou Mining (Group) Co., Ltd. found the best installation sequence and process in the German sieve jig equipment installation at Jining No.3 Coal Mine Coal Preparation Plant. All the components were put in place smoothly to meet the installation precision requirements , Equipment debugging a success. Germany KHD.ROMJIG coal dressing sieve jig shuttle tank-type jig, single weight 48 t, a total of 2 units. Installed in the coal preparation plant sieve workshop +13.100 m elevation