施工中,常遇到因多工种穿插作业导致配合不当造成的返工、扯皮现象,浪费大量人力物力。为有效地克服这些弊病,近年来,我们在青岛华侨新村等几个工程中,推行土建与电气、管道安装一体化施工法,效果较好,具体作法如下。一、主体工程 1.土建与管道安装工程 (1)管道预留孔洞应在上建施工的同时进行。由现场管道工按设计要求找出上、下水管道预留孔洞及卫生洁具安放位置,由施工操作人员负责留出。 (2)在砖墙上预留槽、洞时,应按照图纸要求的标
In the construction, it often encounters reworking and tearing due to misconduct due to multi-workshops’ interspersed work, and wastes a lot of manpower and material resources. In order to effectively overcome these shortcomings, in recent years, we have implemented integrated construction methods for civil engineering, electrical installation and pipeline installation in several projects such as Overseas Chinese Village in Qingdao, and the results are good. The specific practices are as follows. First, the main project 1. Civil and pipeline installation project (1) The pipeline reserved hole should be carried out at the same time as the construction. The on-site plumbers shall find out the positions of the reserved holes for the upper and lower water pipes and sanitary wares according to the design requirements, and the construction operators shall be responsible for setting aside. (2) When reserving slots and holes on a brick wall, it shall be in accordance with the requirements of the drawings