论文部分内容阅读
水利电力部东北勘测设计院在有关方面的大力配合、支持下,通过大量分析计算和科学试验工作,在白山水电站工程设计中采用一系列新技术、新结构和新设备,为加快白山电站建设和发展水电科学技术做出了贡献。现将部分先进技术成果扼要介绍如后。
With the energetic cooperation and support of relevant authorities, the Northeast Survey and Design Institute of the Ministry of Water Resources and Electric Power has adopted a series of new technologies, new structures and new equipment in the design of Baishan Hydropower Station through a great deal of analytical and scientific experiments. In order to accelerate the construction of Baishan Hydropower Station and The development of hydropower science and technology has made its contribution. Now some of the advanced technology achievements briefly described as follows.