首钢京唐公司1号高炉针对长期高压差冶炼制约生产技术进步,全面系统分析自身冶炼特点,通过提高焦炭粒级、提高烧结矿品位、优化护炉方式、降低入炉料碱负荷及锌负荷、优化装料制度和送风制度、提高铁水温度、活跃炉缸等方面入手,不断优化基本制度,高压差冶炼瓶颈问题得到了突破,炉况稳定性增强,各项经济指标得到极大改善。
Shougang Jingtang No. 1 blast furnace for long-term high-pressure differential smelting constraints of production technology advances, a comprehensive and systematic analysis of their own smelting characteristics, by increasing the coke grain size, improve the sinter grade, optimize the mode of protection of the furnace, reducing the charge into the alkali load and zinc load, optimization Charging system and air supply system, raising the hot metal temperature and activating the hearth. The basic system was continuously optimized. The bottleneck problem of high pressure difference smelting broke through. The stability of the furnace conditions was enhanced and various economic indicators were greatly improved.