甘堡水电站土建工程投标及工程监理简介

来源 :水电站设计 | 被引量 : 0次 | 上传用户:chen17983
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
甘堡水电站位于四川省阿坝藏族羌族自治州理县境内,下距汶川48km,距成都164km,电站最大闸高8.7m,引水系统(包括渠道、渡槽和无压隧洞)全长2423m,设计水头69.4m,装机容量2.55万kW。 1984年11月,我院受阿坝州计委的委托,承担了该电站的勘测设计工作。1987年9月,四川省建委、阿坝州政府审查批准了初步设计。为兴建甘堡水电站,阿坝州政府组建了阿坝州林业甘堡水电站工程指挥部(简称指挥部)。施工采取邀请招标承包方式。第一标承建全部土建工程 The Ganpu Hydropower Station is located in Li County of Sichuan Province Aba Tibetan and Qiang Autonomous Prefecture, 48km away from Wenchuan, 164km away from Chengdu and 8.7m high for the maximum sluice. The water diversion system (including channels, aqueducts and non-pressure tunnels) is 2423m in length with a design head of 69.4m , Installed capacity of 25,500 kW. In 1984 November, our hospital commissioned by the ABA Planning Commission, assumed the power station survey and design work. September 1987, Sichuan Provincial Construction Commission, Aba Prefecture government approved the preliminary design review. In order to build Ganpu Hydropower Station, Aba Prefecture government set up Aba Prefecture Forestry Ganpu Hydropower Station Engineering Command (referred to as command). Construction invitation to invite tenders contracting methods. The first standard construction of all civil engineering
其他文献