论文部分内容阅读
陆浑水库总库容13.20亿m3,是一座以防洪为主,结合灌溉、发电、水产养殖、城市供水和旅游等综合利用的大(Ⅰ)型水利枢纽工程,为保证水库管理单位正常的工程及办公用水,2014年陆浑水库管理处对坝区原供水工程进行改造。文章主要介绍自动化改造的过程及电路设计方案,系统改造后,降低了人员的劳动强度,提高了工作效率。
The total storage capacity of Lu Hun Reservoir is 1.320 billion m3. It is a large-scale (Ⅰ) -type water control project mainly combining flood control, power generation, aquaculture, urban water supply and tourism with flood control as the main project. In order to ensure the normal project of reservoir management unit and In 2014, Lu Hun Reservoir Management Office renovated the original water supply project in the dam area. This article mainly introduces the process of automation reform and circuit design. After system transformation, it reduces the labor intensity and improves the work efficiency.