论文部分内容阅读
介绍了一种介于成片与成框之间的“L”型框架的吊装整体方案策划过程,并简单叙述吊装过程中的质量控制。
This paper introduces a planning scheme of the overall lifting scheme of the “L” frame between the sheeting and the boxing, and simply describes the quality control in the lifting process.