论文部分内容阅读
“卡列利亚”号战略核潜艇是D Ⅳ级中的一艘,1989年9月服役,排水量13500吨。该艇指挥围壳后面的导弹仓高高突起,里面垂直摆放着6基SS-N 23潜射弹道导弹
The “Cagliari” strategic nuclear submarine is one of the D Ⅳ classes and was commissioned in September 1989 with a displacement of 13,500 tons. The boat behind the shell of the missile shell high protrusions, which vertically placed 6 base SS-N 23 submarine-launched ballistic missiles