【摘 要】房地产开发项目管理是以高效率地实现项目目标为最终目的,以项目经理负责制为基础,运用系统工程的观点、理论和方法,开发项目建设的全过程按其内在运行规律进行有效的计划、组织、协调、监督和控制的管理系统。具体讲,房地产项目开发建设要实现的目标主要包括成果性目标和约束性目标。成果性目标指投资回报率、销售税率、自有资金利润率等投资效益指标,以及项目的内外部功能要求;约束性目标指建设工期、投资限额、质量标准等。
【关键词】房地产开发项目管理定义;开发风险;管理措施
On the real estate development and project management
Li Na
(Siping City housing development and management of processing integrated Siping Jilin 136000)
【Abstract】Real estate development and project management is to achieve high efficiency for the ultimate goal of the project objectives, project manager responsibility system, based on the use of systems engineering point of view, theories and methods, the whole process of development projects according to their internal operating rules for effective planning , organization, coordination, supervision and control of the management system. Specifically, real estate development and construction to achieve goals and outcomes include binding targets. Achievement of the target refers to the return on investment, sales taxes, profit margins of its own funds and other investment efficiency indicators, and functional requirements of internal and external projects; binding target refers to the construction period, investment limits, quality
【Key words】Definition of real estate development and project management;Development risks;Management measures
房地产开发项目管理是以高效率地实现项目目标为最终目的,以项目经理负责制为基础,运用系统工程的观点、理论和方法,开发项目建设的全过程按其内在运行规律进行有效的计划、组织、协调、监督和控制的管理系统。
具体讲,房地产项目开发建设要实现的目标主要包括成果性目标和约束性目标。成果性目标指投资回报率、销售利税率、自有资金利润率等投资效益指标,以及项目的内外部功能要求;约束性目标指建设工期、投资限额、质量标准等。除此之外,房地产开发项目还受城市规划、土地利用规划等条件制约。房地产开发涉及投资方、监理方、勘察、规划、设计、施工、建材、设备、市政、交通、供电、电讯、银行、文教、卫生、消防、商业、服务、环境等几十个部门,近百个单位,以及最终用户消费者的相互制约和相互影响,因此,房地产项目开发建设是一项复杂的系统工程,必须要有一整套完整、规范和科学的管理保证体系,来统筹和协调开发项目的全过程和确保总体目标的实现。
1. 房地产开发项目的计划、组织、协调、控制管理
对房地产开发项目进行计划管理,能使项目的开发建设有计划、按顺序有条不紊地展开。这就是说,通过使用一个动态计划管理,将工程项目全过程和全部开发活动纳入计划轨道 。组织管理是通过职责划分、授权、合同的签订与执行,以及根据有关法律法规,建立各种规章制度,形成一个高效率的保障体系。协调管理是为开发项目提供协调和谐的公共环境,保证项目开发建设顺利进行。协调管理的主要任务是对开发项目与外部环境、项目各子系统之间,以及项目不同阶段、不同部门、不同层次之间的关系进行沟通与协调。这种沟通与协调将获得市场竞争优势,促进产品销售。控制管理有利于对项目的质量、工期和成本进行控制,以确保开发项目用最少的投入,获得最大的经济效益、社会效益和环境效益等综合效益。
2. 项目决策阶段开发商的项目市场定位及决策机制不完善
2.1 前期对市场研究不充分,决策缓慢,机制不完善。
由于没有详细、“可行”的项目可行性研究报告,使得项目的规划设计迟迟不能如期进行,即使勉强进行了多方案的规划概念设计,也会因为市场研究不充分,心中无底,评判“标准”不明确,犹豫不决,致使项目决策慢、效率低。匆忙的决策,确定的项目产品肯定不科学、不系统、不全面,也不完全可行。 匆忙的决策一定会在以后的项目建设、销售、交付及使用过程中反映出来,可以说由此造成的项目管理难度大。 2.2 施工图设计文件供应迟慢,变更多。
因市场研究阶段进行得不细致、不规范,项目投资决策阶段的问题拖到了项目实施决策阶段来解决,本应属设计师的工作受到了开发商的过多干预和限制,在工程项目管理方面的表现就是施工图技术文件慢、建设过程中变更多。
大量的工程变更严重影响了工程建设的开展,设计师成了“改图师”,设计变更多,工程签证多,故工程的质量、进度、投资控制目标也就无法如期实现。 2.3 重视工程收尾阶段的工作没有从根本上采取措施。
目前的工程管理中,尤其在高层建筑及大型小区的开发建设实施过程的后期,甲方分包工程的施工单位与单位工程总承包施工单位以及甲方分包工程施工单位之间的配合和接口问题上,矛盾越来越突出,成为房地产开发项目管理的难点之一。
3. 加强房地产开发项目风险管理
在开发房地产项目投资中,很多投资商在追求利润的巨大诱惑下,忽略了潜在的风险,对投资项目往往以经验、凭感觉来进行决策,造成很多的盲目性。因此,必须对房地产开发项目的前期投资决策进行深入而细致的分析与研究。尽可能的减少投资风险。
4. 项目成本管理
需要公司总部各部门的通力协作与具体指导,并贯穿于从项目投标开始到项目竣工为止的全过程,每个环节都是相互配合密切联系缺一,如果处理不当,会直接引起项目费用的升降,影响项目的经营效益。作为房地产工程,应加强全过程的成本管理。要从决策出发,再控制设计中的造价,在施工中全面实行决策阶段以及设计阶段中的造价管理方式,按全寿命周期成本最低为原则,进行工程项目成本的控制。所谓房地产开发项目全过程管理,其包括投资决策阶段、设计招投标阶段、项目建设阶段以及竣工经营阶段。在各个阶段的成本控制中,必须按照成本影响因子的程度大小来选取相关比例的措施来控制项目成本,不能一味贪图小便宜而忽略了整个项目中的重点控制的相关内容。纵观整个项目全过程,决策阶段和施工阶段是控制的重中之重。
5. 项目管理
5.1 房地产公司可以通过完善的项目管理来保障项目建设实施的质量。项目建设管理涉及了多种学科,如建筑、结构、暖通、电气、给排水、造价、管理学等等,需要与监理等合作单位及供电、供水等社会关系的协调处理能力,需要对新型建材、新型施工工艺的学习、接受、应用的能力。房地产企业的项目管理,范畴比施工、监理等企业所涉及的内容要广泛,考虑问题要更深入,因此对开发企业应注意项目管理团队的建设,素质必须得到保证,这是项目管理成败的基础。
5.2 房地产开发项目管理的过程还存在着很多问题,我们要正确地对待、评价和处理存在的这些问题,必须站在项目管理的战略高度,从项目启动组织到实施过程管理全过程、全方位地加以控制,加强对开发项目的管理是保证项目目的、项目目标实现的关键,也是实现我国房地产健康发展的必然道路。
[文章编号]1006-7619(2011)11-05-125
[作者简介] 李娜(1980.10.06-),女,职称:助理工程师,职务:科员。
【关键词】房地产开发项目管理定义;开发风险;管理措施
On the real estate development and project management
Li Na
(Siping City housing development and management of processing integrated Siping Jilin 136000)
【Abstract】Real estate development and project management is to achieve high efficiency for the ultimate goal of the project objectives, project manager responsibility system, based on the use of systems engineering point of view, theories and methods, the whole process of development projects according to their internal operating rules for effective planning , organization, coordination, supervision and control of the management system. Specifically, real estate development and construction to achieve goals and outcomes include binding targets. Achievement of the target refers to the return on investment, sales taxes, profit margins of its own funds and other investment efficiency indicators, and functional requirements of internal and external projects; binding target refers to the construction period, investment limits, quality
【Key words】Definition of real estate development and project management;Development risks;Management measures
房地产开发项目管理是以高效率地实现项目目标为最终目的,以项目经理负责制为基础,运用系统工程的观点、理论和方法,开发项目建设的全过程按其内在运行规律进行有效的计划、组织、协调、监督和控制的管理系统。
具体讲,房地产项目开发建设要实现的目标主要包括成果性目标和约束性目标。成果性目标指投资回报率、销售利税率、自有资金利润率等投资效益指标,以及项目的内外部功能要求;约束性目标指建设工期、投资限额、质量标准等。除此之外,房地产开发项目还受城市规划、土地利用规划等条件制约。房地产开发涉及投资方、监理方、勘察、规划、设计、施工、建材、设备、市政、交通、供电、电讯、银行、文教、卫生、消防、商业、服务、环境等几十个部门,近百个单位,以及最终用户消费者的相互制约和相互影响,因此,房地产项目开发建设是一项复杂的系统工程,必须要有一整套完整、规范和科学的管理保证体系,来统筹和协调开发项目的全过程和确保总体目标的实现。
1. 房地产开发项目的计划、组织、协调、控制管理
对房地产开发项目进行计划管理,能使项目的开发建设有计划、按顺序有条不紊地展开。这就是说,通过使用一个动态计划管理,将工程项目全过程和全部开发活动纳入计划轨道 。组织管理是通过职责划分、授权、合同的签订与执行,以及根据有关法律法规,建立各种规章制度,形成一个高效率的保障体系。协调管理是为开发项目提供协调和谐的公共环境,保证项目开发建设顺利进行。协调管理的主要任务是对开发项目与外部环境、项目各子系统之间,以及项目不同阶段、不同部门、不同层次之间的关系进行沟通与协调。这种沟通与协调将获得市场竞争优势,促进产品销售。控制管理有利于对项目的质量、工期和成本进行控制,以确保开发项目用最少的投入,获得最大的经济效益、社会效益和环境效益等综合效益。
2. 项目决策阶段开发商的项目市场定位及决策机制不完善
2.1 前期对市场研究不充分,决策缓慢,机制不完善。
由于没有详细、“可行”的项目可行性研究报告,使得项目的规划设计迟迟不能如期进行,即使勉强进行了多方案的规划概念设计,也会因为市场研究不充分,心中无底,评判“标准”不明确,犹豫不决,致使项目决策慢、效率低。匆忙的决策,确定的项目产品肯定不科学、不系统、不全面,也不完全可行。 匆忙的决策一定会在以后的项目建设、销售、交付及使用过程中反映出来,可以说由此造成的项目管理难度大。 2.2 施工图设计文件供应迟慢,变更多。
因市场研究阶段进行得不细致、不规范,项目投资决策阶段的问题拖到了项目实施决策阶段来解决,本应属设计师的工作受到了开发商的过多干预和限制,在工程项目管理方面的表现就是施工图技术文件慢、建设过程中变更多。
大量的工程变更严重影响了工程建设的开展,设计师成了“改图师”,设计变更多,工程签证多,故工程的质量、进度、投资控制目标也就无法如期实现。 2.3 重视工程收尾阶段的工作没有从根本上采取措施。
目前的工程管理中,尤其在高层建筑及大型小区的开发建设实施过程的后期,甲方分包工程的施工单位与单位工程总承包施工单位以及甲方分包工程施工单位之间的配合和接口问题上,矛盾越来越突出,成为房地产开发项目管理的难点之一。
3. 加强房地产开发项目风险管理
在开发房地产项目投资中,很多投资商在追求利润的巨大诱惑下,忽略了潜在的风险,对投资项目往往以经验、凭感觉来进行决策,造成很多的盲目性。因此,必须对房地产开发项目的前期投资决策进行深入而细致的分析与研究。尽可能的减少投资风险。
4. 项目成本管理
需要公司总部各部门的通力协作与具体指导,并贯穿于从项目投标开始到项目竣工为止的全过程,每个环节都是相互配合密切联系缺一,如果处理不当,会直接引起项目费用的升降,影响项目的经营效益。作为房地产工程,应加强全过程的成本管理。要从决策出发,再控制设计中的造价,在施工中全面实行决策阶段以及设计阶段中的造价管理方式,按全寿命周期成本最低为原则,进行工程项目成本的控制。所谓房地产开发项目全过程管理,其包括投资决策阶段、设计招投标阶段、项目建设阶段以及竣工经营阶段。在各个阶段的成本控制中,必须按照成本影响因子的程度大小来选取相关比例的措施来控制项目成本,不能一味贪图小便宜而忽略了整个项目中的重点控制的相关内容。纵观整个项目全过程,决策阶段和施工阶段是控制的重中之重。
5. 项目管理
5.1 房地产公司可以通过完善的项目管理来保障项目建设实施的质量。项目建设管理涉及了多种学科,如建筑、结构、暖通、电气、给排水、造价、管理学等等,需要与监理等合作单位及供电、供水等社会关系的协调处理能力,需要对新型建材、新型施工工艺的学习、接受、应用的能力。房地产企业的项目管理,范畴比施工、监理等企业所涉及的内容要广泛,考虑问题要更深入,因此对开发企业应注意项目管理团队的建设,素质必须得到保证,这是项目管理成败的基础。
5.2 房地产开发项目管理的过程还存在着很多问题,我们要正确地对待、评价和处理存在的这些问题,必须站在项目管理的战略高度,从项目启动组织到实施过程管理全过程、全方位地加以控制,加强对开发项目的管理是保证项目目的、项目目标实现的关键,也是实现我国房地产健康发展的必然道路。
[文章编号]1006-7619(2011)11-05-125
[作者简介] 李娜(1980.10.06-),女,职称:助理工程师,职务:科员。