冀宁管道支线“留影”

来源 :中国石油企业 | 被引量 : 0次 | 上传用户:talen
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
速度是形象没有速度,没有进度,工程就不能按期完工,不能实现既定投产目标,特别是面对工期紧张、任务繁重的形势, 必须不折不扣地按照工程项目总体执行计划确保工程建设进度,这是举世瞩目的西气东输工程坚决实现中国石油郑重承诺的宝贵经验。今年三四月份,西气东输冀宁支线管道工程建设进度明显提高,滹沱河、卫运河、大汶河、黄河等大型穿越工程相继告捷,河北段线路主体工程率先完工,全线焊接进度快速推 Speed ​​is the image of no speed, there is no progress, the project can not be completed on schedule, can not achieve the established production goals, especially in the face of tight schedules, heavy workload situation, we must faithfully in accordance with the overall implementation of the project to ensure the progress of construction progress, This is the world-renowned project of the West-East Gas Pipeline that has firmly realized the precious experience promised by PetroChina. In March and April this year, the progress of the construction of the Ji-Dong branch pipeline project of West-East Gas Pipeline markedly improved. Major projects such as the Hutuo River, Wei Canal, Dawenhe River and the Yellow River took place in succession. The construction of the main section of the Hebei section was the first to be completed and the welding progress across the board was rapidly pushed
其他文献
本文提出从构建异地就医费用结算平台、逐步提高统筹层次、完成省级计算机系统建设、完善异地就医协管机制以及提高异地就医服务质量等方面解决医疗保险异地就医问题.
期刊
本文通过对荣华二采区10
期刊
In the first century of Anthropology (1870-1970), almost all social sciences studies focused on“objective”,“rational”,“collective”, and “universal” soci
期刊
从2008年世博会建设筹备阶段到2010年世博会正式运营期间,申能物业作为世博物业服务供应商,承担着世博行政中心1-12号楼以及园区非洲联合馆的咨询、接待、会务、秩序维护、场
期刊
多年来,新疆油田通讯公司一分公司营收班坚挣用户至上,规范管理,不断提高员工素质与技能。争创和谐团队,努力“创建一流服务窗口”。
近年来,经国资委批准,石油石化企业核销处置了数额不小的不良资产,其中, 三年以上无动态的长期超储积压物资占相当的比例,有的一家公司就报废积压物资数千万元。物资大量超储
中国航空馆作为世博会159年历史上首个航空主题馆,也是世博会6个中央企业馆之一,在上海世博会举办的184天中,中国航空馆作为明星场馆共接待182万名观众来馆参观,其中有12万人
大庆石化的发展壮大与党的建设密不可分。2010年,公司实现营业收入479.7亿元、完成利润13.2亿元、上缴税费77亿元,营利能力稳居炼化企业前三名。装置生产平稳高效,企业发展呈