论文部分内容阅读
新建大型火电厂必须经历从立项开始 ,经过设计、施工、安装调试、试运行到正式投产运行的漫长阶段。叙述了各个阶段中如何为投运后正常运行做好生产准备的经验
The new large-scale thermal power plants must go through a long period from the start of the project, through design, construction, installation and commissioning, and trial operation to formal operation. Describes how to prepare production for normal operation after commissioning at each stage