论文部分内容阅读
Sutong Bridge is a cable-stayed bridge with a main span of 1 088 m.370 high-precision stress monitoring measured data show that in the process of hoisting the steel box girders,the stress of the main girders is in the fluctuant and complex state and many meteorological factors,such as sunshine radiation,temperature and wind,have important influence on the change of stress of the steel box girders.According to the real-time weather data,the stress data after the process of wavelet denoising from representative measuring points in different weather conditions is picked to estab-lish the stress response brought by meteorological factors with Layered Separation method,thereby basically eliminating the influence of meteorological factors on the stress of main girders,so that accurate and reliable stress data can be got for steel box girders adjustment and cable-tensioned construction control.