论文部分内容阅读
东方红800型水井钻机设计方案审定会议,于一九七四年十二月十六日至十八日在济南举行,历时三天。出席会议的有国家计委地质局、勘探技术研究所、国家建委建研究情报所、华东石油学院等三十个单位,四十九名代表。会议听取了济南钻探设备厂800型水井钻机设计小组的汇报,并认真的审查和讨论了该钻机的初步设计方案。会议认为钻机的主要参数和传动系统基本上是合理的。为了使该钻机设计的更加完善。也提出了一些合理化建议。
The Dongfenghong 800 well drilling rig design validation meeting was held in Jinan from December 16 to 18, 1974 and lasted for three days. Attending the meeting were 30 units and 49 representatives from the State Development Planning Commission Geological Bureau, Institute of Exploration Technology, State Construction and Construction Research and Information Institute, and East China Petroleum Institute. The meeting heard a report from the 800 well drilling rig design team in Jinan Drilling Equipment Factory, and carefully reviewed and discussed the preliminary design of the drilling rig. The meeting considered that the main parameters and drive system of the drilling rig are basically reasonable. In order to make the rig design more perfect. Some rationalization suggestions have also been put forward.