根据国家水利部《水利水电工程等级划分及洪水标准》(SL252-2000)的规定,装机容量5MW以下为小型水电站工程。小型水电站工程相对于大、中型水电站工程建设投资规模较小,在工程项目合同执行模式的选择上多采用施工总承包的方式。由于施工总承包为固定总价合同,在进度结算支付以及合同管理方面与固定单价合同有很大不同,项目法人在项目管理中必须以新思路、新方法才能保证工程建设得以顺利实施。
According to the provisions of “Classification of Water Conservancy and Hydropower Projects and Flood Standards” (SL252-2000) issued by the Ministry of Water Resources, the installed capacity below 5MW is a small hydropower project. Small hydropower projects relative to the large and medium-sized hydropower project construction investment is small, the project implementation of the contract mode of choice more than the use of general contracting methods. As the general contracting of construction contracts is a fixed total price contract, there is a big difference between fixed contract of settlement and payment of settlement and contract management. Project managers must adopt new ideas and methods in project management to ensure smooth implementation of project construction.