论文部分内容阅读
本文以委内瑞拉卡贝略港新集装箱码头项目钢管桩施工为实例,分别对大直径钢管桩在复杂地质条件下进行陆上吊打施工过程中遇到的常见问题进行原因分析,并对相应处理措施进行探讨和总结,希望对今后同类型结构型式的施工过程中遇到的问题提供解决方案的参考和借鉴。
Taking the steel pipe pile construction of the new container terminal project of Cabelloux Port, Venezuela as an example, the paper analyzes the common problems encountered during the construction of large-diameter steel pipe pile under the complicated geological conditions, and analyzes the corresponding problems Measures to explore and summarize, I hope for the future with the construction of the same type of construction problems encountered in the process of providing solutions for reference and reference.