我省地方国营工业1956年基本建设任务是相当繁重的,工作量之大超过以往任何一年,加之上半年由于组织管理和技术力量薄弱,机械设备、建筑器材与设计、施工、检修、安装以及运输力量之紧张,加上某些重大计划项目之变动,致使上半年仅完成年度计划的18%稍强。七月份本系施工旺季,也只完成年度计划的3%。这说明还有80%左右的工作量,需要在所余的五个月内,尤其是土建工程,又需要在仅有的三个月以内上冻前完成,所以时间短促,任务繁重的情况,已明显的摆在我们面前。
The basic construction tasks of the local state-owned industry of our province in 1956 were rather heavy, the workload was greater than any previous year, and due to weak organizational management and technical strength in the first half of the year, mechanical equipment, construction equipment and design, construction, overhaul, installation, and The tension in transportation, coupled with changes in certain major planned projects, resulted in a slightly stronger 18% of the completion of the annual plan in the first half of the year. In the construction season of the Department in July, only 3% of the annual plan was completed. This shows that there is still 80% of the workload, which needs to be completed within the remaining five months, especially for civil engineering projects, before it is frozen within only three months. Therefore, the time is short and the tasks are heavy. Obviously before us.