【摘 要】
:
The postcranial skeleton of a new specimen of the long-tailed lizard Dalinghosaurus longidigitus was excavated from the Yixian Formation in Lingyuan, western Li
【机 构】
:
School of Earth and Space Sciences,Institute of Geology
论文部分内容阅读
The postcranial skeleton of a new specimen of the long-tailed lizard Dalinghosaurus longidigitus was excavated from the Yixian Formation in Lingyuan, western Liaoning. The new specimen provides more anatomical information about this species, especially about the anterior dorsal vertebrae, shoulder girdle and forelimbs. This lizard can be included within the clade Scleroglossa by its 27 or more presacrals, moderately long pubis, and gently notched distal end of tibia. But the detailed systematic position for this taxon remains undetermined. The features of the much longer hind limbs and pes compared with forelimbs and manus, metatarsal IV longer than III, pedal phalanges robust, and penultimate phalanx not longer than other phalanges etc. suggest that this lizard was a running and ground swelling animal.
其他文献
1 工程概况 江苏通舟海洋工程装备有限公司船台水下滑道不慎被撞受损,經水下探摸发现西侧滑道25-28#排架井字梁相对偏差值为15.50mm,其余相邻排架状况良好。据此情况,我们判定原桩基受损严重,已不宜继续使用,需做修复处理。
The ultrahigh-pressure eclogites from the northern Dabie Mountains in central China occurred as tectonic lens or blocks within granitic gneisses or meta-peridot
目的 探讨保健食品试制现场核查中的常见问题,以期实现试制现场核查的规范化管理.方法 从保健食品试制的全过程中查找问题,主要包括物料质量管理与控制,生产过程与中间控制、
The Mianlue tectonic zone (Mianlue zone), an ancient suture zone in addition to theShangdan suture in the Qinling-Dabie orogenic belt, marks an important tecton
The deviation control of directional drilling is essentially the controlling of two angles of the wellbore actually drilled, namely, the inclination and azimuth
本文从给排水工程的重要性和新时期人们对给排水工程的新要求入手.谈及给排水工程建设质最监理的重要性和必要性,进而根据给排水工程施工的实际情况依次从给排水工程施工准备
Zircons from the auriferous quartz vein in the Rushan gold deposit, Jiaodong Peninsula, have high common Pb contents (206pbc = 2.00%-15.88%) and Th/U ratios (0.3
Municipal waste disposal system by high temperature smelting has the following characteristics: ① The smelting temperature is as high as 1 700-1 800 ℃; ② The
本文主要阐述了预应力桥梁的施工问题、预应力施工工艺及施工质量控制措施等问题.