论文部分内容阅读
采用MIDAS/GTS软件分析了某地块建设对无锡地铁5号线工程的影响,在区间及周边建筑等环境下,模拟了基坑开挖、结构回筑、正常使用等各工况,进行静力非线性全过程分析,结果表明,规划地块的正常建设对地铁区间的影响在安全可控范围内。
Using MIDAS / GTS software to analyze the influence of a block construction on the project of Wuxi Metro Line 5, simulating the conditions of excavation, structure back-up, normal use and so on under the environment of interval and surrounding buildings, Nonlinear full-force process analysis shows that the normal construction of the planned block has a safe and controllable impact on the subway area.