变顶高尾水洞

来源 :中国三峡 | 被引量 : 0次 | 上传用户:sswei1988
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
变顶高尾水洞这种方式的特点是下游水位与洞顶的某一处相衔接,将尾水洞分成有压满流段和无压明流段。当下游处于低水位时,下游水位与洞顶较低处相衔接,此时有压满流段短,而无压明流段长,尾水管进口的真空度不会超过规范的要求。随着下游水位的升高,有压满流段的长度逐渐增长,无压明流段的长度逐渐减小,发生过渡过程时尾水管中负水击压力随之增大,但此时,下游水位升高引起淹没深度逐渐加大,两种压力叠加,尾水管进口的真空度仍不会超过规范的要求。 The top-tailing cave is characterized by a convergence of the downstream water level and the roof somewhere, and the tailwater cave is divided into a pressure-filled flow section and a pressureless flow section. When the downstream is in the low water level, the downstream water level is connected with the lower part of the tunnel roof. At this time, the pressure full flow section is short, and the pressureless flow section is long and the vacuum degree of the draft tube inlet will not exceed the requirements of the code. With the increase of downstream water level, the length of the pressure-filled flow segment gradually increases, and the length of the unpressurized flow segment decreases gradually. As a result, the negative water hammer pressure in the draft tube increases during the transition, but at this time, Submerged depth gradually increased due to water level rise, superposition of two kinds of pressure, draft tube inlet vacuum still will not exceed the normative requirements.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
期刊
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
主持人:rn在双重劳动关系下,劳动者可否享受多个带薪年休假呢?例如,有一位职工,白天在一个单位工作8小时,晚上在另一家单位帮助值班,没事可以睡觉,有事必须随叫随起.他能在这
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
期刊
目的总结报告手足徐动症继发颈椎病的手术治疗结果,分析其发生特点与治疗原则.方法对32例手足徐动症继发颈椎病患者的症状、体征、手术方法及手术并发症等进行分析,并与同期
在介绍了河北省联通公司视频会议系统改造的背景后,依据系统设计的原则,客户的需求,详细介绍了项目升级改造方案.