德兴铜矿是我国有色冶金工业特大型现代化矿山。1967年开始露天开采,现已建成日采选矿石1.5万吨的规模,二期扩建1.5万吨/日,1986年可建成,三期扩建6万吨/日工程亦已开始建设。采区矿化面积达6147亩,现已开挖1019亩;剥离废石总量为11.04亿吨,现已堆存废石5548万吨,占地420亩;尾矿总量7.15亿吨,现已堆存尾矿量3847万吨,占地1737亩;目前,矿区总面积已达35126亩,其中已征水田3385亩;扩建待征地面积29244亩,其中水田2770亩。
Dexing Copper Mine is China’s non-ferrous metallurgy industry large-scale modern mines. Open-pit mining started in 1967, and the scale of 15,000 tons of ore has been built daily. The second phase has been expanded by 15,000 tons / day. It can be completed in 1986 and the 60,000 tons / day project of the third phase of expansion has started construction. Mining area of 6147 acres of mining area, has now been excavated 1019 acres; total stripping of waste rock 1.101 billion tons, 55.48 million tons have been deposited waste rock, covering 420 acres; tailings total 715 million tons, is The accumulated amount of tailings has been 38.47 million tons and covers an area of 1737 mu. At present, the total area of the mining area has reached 35,126 mu, of which 3385 mu have been requisitioned for paddy land; and 29,244 mu of land for expropriation has been expanded, of which 2770 mu is paddy field.