论文部分内容阅读
核电作为新型电厂,它不同于水力发电、火力发电。它的设计、材料的采制造、设备安装以及调式都直接影响电厂后期制造,设备安装以及调试都直接影响电厂后期的核安全及正常发电。严格依据法律规定,着重考虑工程承包模式和各阶段的工程特点,结合核电厂使用方,多年在设备的质量要求方面积累经验,总结出一套工程总承包下的设计、采购、施工等工作在各个时期的侧重点,并对工程建设设备调试期间所发生的问题提出改进创新的意见和建议。
Nuclear power as a new power plant, it is different from hydroelectric power, thermal power generation. Its design, material mining, equipment installation and adjustment have a direct impact on power plant post-manufacturing, equipment installation and commissioning directly affect the nuclear power plant safety and normal power generation. Strictly in accordance with the laws and regulations, with emphasis on project contracting mode and engineering characteristics of each stage, combined with the use of nuclear power plants for many years in the quality of equipment requirements accumulated experience summed up a project under general contracting design, procurement, construction work in The focus of each period, and engineering construction equipment debugging problems arising during the proposed improvements and innovations.