希望研究并推广长江大桥的管柱施工法

来源 :水力发电 | 被引量 : 0次 | 上传用户:fanke26
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
“水力發电”1957年3期發表了北京建筑工程局唐永祥同志希望大家研究把長江大桥的管柱施工法应用到水工结構工程的建議,引起我很大的兴趣。有一次我在四川省委礼堂听关于長江規划問題的宯}演讲时,曾听到有希望应用管柱施工法作水埧圍埝的施工院?再也沒有听到对这创議的响应了!因此,特写信问问你们,对这个問題現在研究到什么程度?你們怎样支持的? “Hydropower” issued in the third issue of 1957. Comrade Tang Yongxiang of the Beijing Construction Engineering Bureau hoped that everyone would study the proposal to apply the method of string construction of the Yangtze River Bridge to the hydraulic structure engineering project, which aroused my great interest. Once when I listened to the speech on the planning of the Yangtze River in the Sichuan Provincial Party Committee Auditorium, I heard a construction brothel that hopes to apply the string construction method as a water cofferdam and never heard the response to this proposal. As a result, close-up letters ask you, what is the current level of research on this issue and how do you support it?
其他文献
装机弃量(兆瓦)105;{1。弓5翌电量(百jJ度)1,5牛}19弓5装机容量(兆瓦),。。。{1。。。翌电量(百万度) l 19厅4.!1955玻利推亚委内瑞拉海几仓危地肠拉洪都于次斯多米少己加哥
水力发电建设总局为了贯徹党的二中全会决议精神,已于2月11日至21日在北京召开全国水电勘测设计会议,着重讨论如何在勘测设计工作中开展增产节约运动,并根据勤俭建国和勤俭
1955年西德的发电量约为750亿度,发电设备容量为1700万瓩,最高负荷为1400万瓩。发电厂是国产煤的最大用户。1954年原煤产煤量是2800万~3000万吨,发电厂用煤量约为1800万吨;褐
电力工業部水力發电建設总局为了向广大羣众广泛深入地宣传我国水电建設的偉大成就,將于十月初在北京風景秀丽的北海公园举行第一届水力發电建設展覽会。在展覽会上将用大量
我国今年的基本建设正以更快的速度前进着。今年的基本建设计划投资额比去年增加了62%。在水利建设方面1956年的基本建设为1955年投资额的251.1%。为了保证这种空前规模的基
2011年2月,胡锦涛等中央领导同志在省部级主要领导干部社会管理及其创新专题研讨班上发表重要讲话,深刻阐述了加强和创新社会管理的重要意义,对新时期加强和创新社会管理提出
随着祖国经济建设和文化建设的突飞猛进,人民对美的感受和艺术欣赏能力也迅速地提高了。在一个水电站建成以后,你常会听到人这样说:这个水电站像“百货公司”,或者说那个电
翌电最奖口别人「l〔「人)(I’了万度)f于人雄得的赞电量(度)翌电增加率(以195()‘卜为10〔))。台火力(干旺)机弃水力(干赶)最J公l·(r-肚)0 000 000 00介国加取九英国l,q德1
苏联先进生产者、钻工科尔钦柯同志,在今年四月间来我国表演高速钻孔和机动攻丝时,曾留下一套机动攻丝夹头。我厂用这套夹头进行了几次试验,攻 M6~M10的螺纹,只要半分多钟,而
1957年水力發电第4期上,發表了許自达同志的“应用数学统計法进行年調节計算的线解圖”一文,我学習了以后有以下几点意见提供研究和商讨。許自达同志文章有两个要点:1.簡化