论文部分内容阅读
按照法国法规规定,在计划兴建一个大型基建投资工程时,要求组织一次公开听证会。修建谢拉斯水库工程的目的是增加法国西南部加龙河的夏季流量,它是见证此类听证会的第1座大型水利工程。
As required by French legislation, a planned public hearing is required when planning to build a large infrastructure investment project. The purpose of the construction of the Schelers Reservoir Project is to increase the summer flow of the Garonne River in southwestern France, the first large-scale water project to witness such hearings.