随着我国经济的快速发展,电网建设迎来了一个新的高峰期。然而由于电源并网工程项目通常跨越高速公路、铁路和电力线路等,且沿线需要大量拆迁,通道协调较为困难,施工受阻不可避免,工程组织和管理难度加大。以河南某电厂500kV送出输变电工程项目为例,通过实践得出一套以三级联动进度计划体系为主线,以P6软件和灵活多样的项目管理手段为依托,使设计、采购和施工之间合理交叉、相互协调的工程进度控制方法。
With the rapid economic development in our country, the power grid construction ushered in a new peak. However, the project of power grid connection usually crosses expressways, railways and power lines, etc., and requires a large number of relocation along the route. The channel coordination is more difficult, the construction is blocked, and the engineering organization and management are more difficult. Taking a 500kV transmission and distribution project in a power plant in Henan Province as an example, a set of three-stage linkage planning system is taken as the main line through practice, which is supported by P6 software and flexible project management tools to make design, procurement and construction Between the reasonable cross, coordinated project progress control methods.