论文部分内容阅读
他们在深山峡谷中肩挑背扛,通过十多年的努力,完成了猫跳河流域梯级开发。他们垒起的不仅仅是一座座大坝,更是筑起了一道坚不可摧的精神高地。1982年,我从师专毕业,被分配到中国水电第九工程局五级子弟学校,学校是猫跳河第五级水电站建设工地的水电九局所属子弟学校。这所学校建在猫跳河流域的工地上,我在这里整整工作了5年。学校规模不小,从小学到初中直至高中,有两千师生。
They shoulder back and shoulder in the mountains and valleys, through more than 10 years of hard work, completed cat jump river cascade development. They not only built a base dam, but also built an indestructible spiritual heights. In 1982, I graduated from a teacher training college and was assigned to the fifth grade school of China Hydropower Engineering Bureau No.9. The school is a school affiliated to the ninth hydropower station under the construction site of the Cat No.5 Hydropower Station. The school was built on the site of the cattail river basin and I have been working here for five years. The school size is not small, from elementary school to junior high school until high school, there are two thousand teachers and students.