论文部分内容阅读
针对渔子溪等水电站高水头水轮机运行于含沙水流中的导水机构的磨损情况,进行了水力试验研究。
Aiming at the abrasion condition of the water guide mechanism of high head turbine running in sandy water flow such as Yuzizi Hydropower Station, hydraulic test was carried out.