夹马口电灌站是山西省运城地区的提黄灌溉工程。电灌站的设计提水流量为9.5米~3/秒,泵站扬程为70米,有10台套抽水机组,总装机容量7800千瓦,灌区设计灌溉面积40万亩,是一座大型提水工程。该灌区人口14.8万,人均占有耕地3.7亩。灌区农作物以粮棉为主,其中小麦占57%,棉花占23%,玉米占9%,其他作物为11%。夹马口提水工程于1958年动工,主体工程于1960年竣工,泵站机组于1961年部分投产,1966年全部发挥效益。该工程由泵站枢纽和灌区组成。枢纽包括:黄河护岸,进水闸,拦污设施,引水渠,前池,泵房,管路
Jiamakou electric station is filling folder Yuncheng Yellow River irrigation project in Shanxi Province. Electric pumping station design lift water flow of 9.5 m ~ 3 / s, pumping station lift of 70 meters, 10 sets of pumping units, with a total installed capacity of 7800 kilowatts, irrigation design irrigation area of 400000 acres, is a large lift project. The irrigated population of 148000, 3.7 acres of arable land per capita. Irrigated crops are mainly cotton and grain, with 57% of wheat, 23% of cotton, 9% of corn and 11% of other crops. Jiamakou pull water project started construction in 1958, the main project was completed in 1960, pumping station unit in 1961, part of the put into operation in 1966, all play an effective. The project consists of pumping station hub and irrigation area. Hubs include: Yellow River bank protection, intake, pollution control facilities, diversion channels, front pool, pump room, pipeline