新疆油田公司七东1区聚合物驱投产实验后,随着聚合物驱采油井见效和产出液含聚浓度的升高,抽油杆柱偏磨断脱日趋严重。针对这一难题,本文章通过管杆柱受力分析、杆柱优化调整以及防治措施研究,形成适用于聚驱采油井杆管防断脱配套技术,延长检泵周期,为新疆油田30万吨聚合物驱重大试验项目提供技术支持。
After the polymer flooding production test was carried out in Qidong1 area of Xinjiang Oilfield Company, with the effective of polymer flooding and oil well and the increase of concentration concentration of produced fluid, the sucker rod column partial abrasion became increasingly serious. In response to this problem, this article through the pipe rod force analysis, optimization and adjustment of the rod column and prevention and control measures to form suitable for polymer flooding oil well pipe break off supporting technology to extend the pump cycle, Xinjiang Oilfield 300,000 tons Polymer Flooding major test project to provide technical support.