我公司选煤厂是与新庄矿配套的矿井型选煤厂,于1998年投产,设计入选能力为90万 t/a,目前实际生产能力达180万 t/a。2003年起,入选原
Our coal preparation plant is a mine-type coal preparation plant which is equipped with Xinzhuang Mine. The coal preparation plant was put into operation in 1998 with a design capacity of 900,000 t / a and an actual production capacity of 1.8 million t / a at present. Since 2003, selected original