1 前言 山东潍坊发电厂一期工程2×300MW火电机组由中国东方电气集团公司三大主机厂负责主要设备制造的优化工作。四年多来在各级领导的关怀支持下,中国东方电气集团公司及各设备制造厂与山东电力局及所属各单位共同努力,团结造机、团结装机,使潍坊工程优化工作达到了预期的目标,取得了可喜的成果,两台机组分别于1993年9月23日和1994年10月27日顺利移交生产。~#1机在十个方面创下山东同类机组最好水平,为其它电站工程创造了宝贵的经验,为东方机组树立了样板。
1 Introduction The 2×300MW thermal power unit of Shandong Weifang Power Plant Phase I is responsible for the optimization of major equipment manufacturing by the three major OEMs of China Dongfang Electric Corporation. For more than four years, with the support of the leaders at all levels, China Dongfang Electric Corporation and its equipment manufacturing plants have worked with the Shandong Electric Power Bureau and its subsidiaries to unite the machine and unite the aircraft to optimize the Weifang project. The goal has achieved gratifying results. The two units successfully transferred their production on September 23, 1993 and October 27, 1994 respectively. The ~#1 machine created the best level of similar units in Shandong in ten areas, which created valuable experience for other power station projects and set a model for the Dongfang units.