论文部分内容阅读
北国名城哈尔滨的冬天,地上虽冰封雪飘,寒气逼人,但地下人防工程内却人潮如涌,温暖如春,豪华气派。哈尔滨市的人防工程,发展如此之快,规模如此之大,买在令人感叹。学习哈尔滨市人防建设的基本经验,对于我们搞好新时期的人防工作,具有很好的借鉴意义。 一、更新观念,加快发展 “八五”期间,特别是党的十四大和邓小平同志南巡谈话之后,哈尔滨市人防办从适应现代高技术条件下的战争需要出发,从适应币场经济的发展需要出发,在解放思想,更新观念上狠下了一番功夫,加快发展的胆子更大了,步子更快了。以工程建设为例,“八五”期间实现了高速发畏,5年新建大型人防工程8个,总面积达13
Winter in the northern city of Harbin, although the ice floating on the ground floating, cold pressing, but the underground civil defense project is crowded, warm as spring, luxurious style. Harbin’s civil air defense projects, the development so fast, the scale is so large, buy in sigh. Studying the basic experience of civil air defense in Harbin has a good reference for us to do a good job of civil air defense work in the new era. I. Renewing Concept and Speeding up Development After the Ninth NPC talk during the Eighth Five-Year Plan period, especially at the 14th National Congress of the Party and Deng Xiaoping, the Harbin Civil Defense Office started from adapting to the needs of the war under the conditions of modern high technology and from the economic development of the market economy, We need to start out and make a lot of efforts in emancipating the mind and in updating our concepts. The courage to speed up development is even greater. The pace is even faster. Take the project construction as an example, during the “Eighth Five-Year Plan” period, it achieved high speed and daunting. In 5 years, it built 8 large-scale air defense projects with a total area of 13