凿井提升吊桶提梁的塑性分析与计算

来源 :建井技术 | 被引量 : 0次 | 上传用户:qiaomy
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
吊桶提梁是一个承受拉弯的构件,它从开始承受荷载直到最后破坏,其受力和变形过程可以分为四个阶段,即弹性阶段、屈服阶段、强化阶段和拉断阶段。 目前我国各种容积的矸石吊桶提梁为一次超静定结构(图1),新设计的4米~3、5米~3吊桶提梁为二次超静定结构(图2)。现以4米~3提梁为例进行讨论,则其它各吊桶提梁的受力和变形过程可用此方法类推。 Bucket lifting beam is a member subjected to bending, it is from the beginning to bear the load until the final destruction, the force and deformation process can be divided into four stages, namely, elastic phase, yield phase, strengthening phase and pull-off phase. At present, dumping beams with various volumes of waste rock bucket in our country are an ultra-statically indeterminate structure (Fig. 1). The newly designed beam of 4m ~ 3, 5m ~ 3 buckets is a secondary statically indeterminate structure (Fig. 2). Now 4 m ~ 3 billet as an example for discussion, then the rest of the bucket bar lifting force and deformation process can be used analogy.
其他文献
最近,自贡天然气化工研究所以二乙炔为基础成功地合成了带三键的选矿药剂——乙炔乙烯基丁醚和丁炔二缩丁醛。乙炔乙烯基丁醚分子式CH≡C—CH≡CHOC_4H_9,分子量124,沸点(8~9
三维快速制造技术是近20年来随着市场经济飞速发展应运而生的一项新型技术。我国三维技术的开发与应用已步入产业化生产,取得了巨大的经济效益。本文从三维快速技术开发与应
为进一步推动兴起学习贯彻“三个代表”重要思想新高潮,充分反映各地基层学习贯彻“三个代表”重要思想新成效,中宣部从2003年9月初开始组织开展了“‘三个代表’在基层”大
牟定铜矿设计为采选能力1500吨/日的中型矿山.选矿生产流程为阶段磨矿、阶段选别,即原矿经一段磨机磨至-0.074m/m占50%左右进入粗选,粗Ⅰ尾矿经第二段磨磨至-0.074m/m占80%
以回路模拟作为最优化模型,研究了磨矿回路离线最优化程序。用一个转换方程使可控变数维持在上下限之间。补偿函数阻止了旋流器的绳状排料和磨机过载。本研究之目的在于在给
为实践“贴近实际、贴近生活、贴近群众”,让群众喜闻乐见,喜闻乐听,上海电视台于10月16日下午,在上视大厦举行了上海电视台区县记者站成立仪式。上海文广新闻传媒集团领导黎
目的:通过检测参与本实验的变应性鼻炎患者外周血中CD4+CD25+Treg细胞在外周血CD4+Treg细胞中的所占比(%),进一步比较和探讨口服益生菌和特异性免疫治疗在治疗变应性鼻炎中存
我矿为一大型采选联合企业。1958年建成投产时,井下即已采用留矿采矿法。随着机械化程度的提高,围绕提高采矿强度、崩矿效率和矿石回收率,我矿在留矿法采场结构要素,凿岩爆破
在《矿物工业》杂志(Industrie Minérale)1978年第4期上,索克米纳(Socomine)公司发表了有关“露天矿设计编制”若干问题一文,文中特别提到了确定最佳露天矿境界的图解法。
无轨运输在捷克金属矿地下采矿中的应用引起了生产的根本变化,因而回采规模日益扩大,生产能力不断捉高。这种新工艺不仅改善了采矿作业,也减少了工人的体力劳动。然而,这种