小浪底工程排沙洞无粘结预应力混凝土衬砌试验段实测分析

来源 :水利水电技术 | 被引量 : 0次 | 上传用户:xpzcz1992
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
黄河小浪底水利枢纽工程排沙洞混凝土衬砌采用了双层双圈环锚无粘结预应力新技术,文中对其洞内试验段的预应力钢筋和测试元件布置,以及洞内无粘结预应力混凝土施工工艺做了概括总结.结合从开始浇筑混凝土到预应力钢筋张拉锚固结束的全过程中对衬砌混凝土和普通钢筋的应力及洞径变化等实测资料,分析了混凝土温度收缩应力变化和衬砌混凝土预压应力分布规律,论述了洞内试验段衬砌混凝土裂缝的成因,提出了优化混凝土配合比、加强施工温控的改进建议. The Yellow River Xiaolangdi Water Conservancy Project of sand drainage tunnel concrete lining with a double double ring ring anchor unbonded prestressed new technology, the article of its experimental section of the cave prestressed steel and test element arrangement, as well as the hole without prestressed cement Concrete construction process done a summary. Based on the measured data of the changes of the stress and the diameter of the lining concrete and ordinary steel in the whole process from the beginning of pouring the concrete to the end of the prestressing tensioning and anchoring, the temperature shrinkage stress of the concrete and the prestressed stress distribution of the lining concrete are analyzed. The cause of the crack in the lining concrete in the test section of the tunnel was put forward. Suggestions for improving the mix proportion of concrete and strengthening the temperature control in construction were put forward.
其他文献
期刊
期刊
期刊
期刊
在郑州市航海路与京广铁路立交桥的西南角,有一个不起眼的小村邱寨村。近两年,来自四川、湖南、甘肃、重庆等地的传销大军一拨接一拨,700人的小村庄高峰时住了1500多人。如
期刊