金沙江向家坝水电站是我国第三大水电站,装机容量640万千瓦。工程于2004年4月开始筹建,2006年11月26日正式开工,2008年12月实现大江截流。经过近八年的建设,向家坝水电站于2012年10月10日下闸蓄水,10月16日蓄水至高程354米,11月6日,首台机组投产发电。在工程建设过程中,中国三峡集团公司贯彻落实科学发展观,秉承“建好一座电站,带动一方经济,改善一片环境,造福一批移民”的新型水电开发理念,在水电开发中正确地处理工程建设与生态环境保护的关系,做出了卓有成效的工作。
Jinsha River Xiangjiaba Hydropower Station is China’s third largest hydropower station, installed capacity of 6.4 million kilowatts. Construction began in April 2004 to build, officially started on November 26, 2006, December 2008 to achieve major river closure. After nearly eight years of construction, Xiangjiaba hydropower station under the gate on October 10, 2012 water storage, water storage to an elevation of 354 meters on October 16, November 6, the first unit put into operation. In the process of project construction, China Three Gorges Corporation implemented the concept of scientific development, adhering to the new hydropower development concept of “building a power station, boosting one side economy, improving one environment and benefiting a batch of immigrants” Deal with the relationship between project construction and ecological environment protection, and have made fruitful work.