论文部分内容阅读
新疆电力试验研究所成立至今已经整整四十周年了。 1949年和平解放时,旧中国留给新疆的是满目疮痍,偌大的占全国总面积1/6的新疆仅存7座总装机不过998千瓦的奄奄一息的小电厂,电力科技在当时根本无从谈起。然而仅仅到1959年,新中国就以她崭新的社会制度在新疆形成了工农业建设全面发展的态势,基本形成了门类齐全的工业体系,电力工业处于工业先行官的地位优先得到了发展。苇湖梁电厂、伊犁电厂、塔城电厂、奎屯电厂等电厂陆续建设起来并投入运行。这时电力科技已成为迫切的需求,1959年12月17日,新疆电力试验研究所的前身——新疆电力工业管理局中心试验所正式成立了。
Xinjiang Electric Power Research Institute has been established since the 40th anniversary. At the time of peaceful liberation in 1949, the old China left Xinjiang with only devastated and stagnant small power plants in Xinjiang, accounting for only 1/7 of the total area in Xinjiang, with a total installed capacity of 998 kilowatts. There was absolutely no mention of power technology at that time. However, only in 1959, with the new social system in her country, formed a comprehensive development of industrial and agricultural construction in Xinjiang, and basically formed a complete industrial system. As a pioneer in the power industry, the position of power industry was prioritized. Weihu Liang Power Plant, Ili Power Plant, Tacheng Power Plant, Kuitun Power Plant and other power plants have been built up and put into operation. At this time, power technology has become an urgent need. On December 17, 1959, the predecessor of the Xinjiang Electric Power Research Institute, the Xinjiang Electric Power Industry Administration Central Test Center was formally established.