Rule-based scheduling of multi-stage multi-product batch plants with parallel units

来源 :Chinese Journal of Chemical Engineering | 被引量 : 0次 | 上传用户:F8251256
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
A novel rule-based model for multi-stage multi-product scheduling problem(MMSP)in batch plants with parallel units is proposed.The scheduling problem is decomposed into two sub-problems of order assignment and order sequencing.Firstly,hierarchical scheduling strategy is presented for solving the former sub-problem,where the multi-stage multi-product batch process is divided into multiple sequentially connected single process stages,and then the production of orders are arranged in each single stage by using forward order assignment strategy and backward order assignment strategy respectively according to the feature of scheduling objective.Line-up competition algorithm(LCA)is presented to find out optimal order sequence and order assignment rule,which can minimize total flow time or maximize total weighted process time.Computational results show that the proposed approach can obtain better solutions than those of the literature for all scheduling problems with more than 10 orders.Moreover,with the problem size increasing,the solutions obtained by the proposed approach are improved remarkably.The proposed approach has the potential to solve large size MMSP. A novel rule-based model for multi-stage multi-product scheduling problem (MMSP) in batch plants with parallel units is proposed. The scheduling problem is decomposed into two sub-problems of order assignment and order sequencing. Firstly, hierarchical scheduling strategy is presented for solving the former sub-problem, where the multi-stage multi-product batch process is divided into multiple sequentially connected single process stages, and then the production of orders are arranged in each single stage by using forward order assignment strategy and backward order assignment strategies respectively according to the feature of scheduling objective. Linear-up competition algorithm (LCA) is presented to find out the optimal order sequence and order assignment rule, which can minimize total flow time or maximize total weighted process time. Computational results show that the proposed approach can obtain better solutions than those of the literature for all scheduling problems with more than 10 orders.Moreo ver, with the problem size increasing, the solutions obtained by the proposed approach are improved remarkably. proposed proposed approach has the potential to solve large size MMSP.
其他文献
In this work, the group contribution method of Chickos et al. was applied to estimate the fusion enthalpy of isonicotinic acid, and the obtained result(29.2 k J
It has been known that the productivity of artesian wells is strongly dependent on the rheological properties of crude oils. This work targets two deep artesian
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
随着有色金属电解行业生产电压电流等级的不断提高,对整流设备安全可靠性的要求也越来越高。ABB大功率整流器在设计时全面考虑整流供电系统中各种电器设备的配合以及运行安全
Process Systems Engineering(PSE)is an extremely wide field that has a variety of applications in industries,which provides opportunities in the field where impo
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
The rise in the use of global polyester fiber contributed to strong demand of the Terephthalic acid(TPA).The liquid-phase catalytic oxidation of p-xylene(PX)to
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥