论文部分内容阅读
上海港属不规则半日潮,涨水流在五个小时左右,落水流长达七个小时左右,所以在上海港航行,基于流对航速、船位的控制都有较大影响,因此流是我们必须考量的因素之一。尤其随着上海国际航运中心建设的步伐日益加快,通过和靠泊上海港的船舶大型化趋势明显,船舶流量也迅速增加。数据统计显示,2010年上海港集装箱吞吐量2905万TEU,超过新加坡的2840万TEU,成
Due to the irregular half-day tide in Shanghai port, the water flow is about five hours and the water flow lasted about seven hours. Therefore, when it comes to Shanghai Port, the flow-based control of speed and position has a great influence on the flow. Therefore, One of the factors to consider. In particular, as the pace of construction of Shanghai International Shipping Center accelerates, the trend of large-scale ships passing and berthing the Shanghai Port obviously increases and the volume of ship traffic also increases rapidly. Statistics show that in 2010, the container throughput of Shanghai Port was 29.05 million TEUs, more than Singapore’s 28.4 million TEUs.