论文部分内容阅读
The Three Gorges Project is one of the essential key projects for flood controlling and water resources regulation in the Yangtze River.The project includes a river-crossing dam,underground powerhouses,and navigation structures.Because of the huge size and complicated construction technologies,the project faced a series of challenging engineering issues.In terms of rock mechanics,there are many key technical issues,including the sliding resistance and stability of the dam section along the foundations of powerhouses No.1-5,the slope stability of the double-line five-stage shiplock,excavation of large-scale underground powerhouses,and curtain grouting under the dam.With decades of scientific research and 16 years of practical construction experiences and reservoir operations,these key technical issues in construction of the Three Gorges Project are successfully resolved,which will attribute to the development of hydropower technology.On the basis of the monitoring data during construction and normal operation periods of the Three Gorges Project,this paper presents a systematic analysis of these key rock mechanical issues in terms of behaviors,solutions,dynamic controlling,monitoring arrangement and integrated assessment.