论文部分内容阅读
广东大亚湾核电站位于景色秀丽的大亚湾畔,与深圳的直线距离为45公里,距香港约50公里。大亚湾核电站是我国引进国外资金、设备和技术建设的一座大型商用核电站,是我国改革开放政策的产物,是粤港双方团结合作的结果,也是中外合作的结晶。核电站安装两台单机容量为984MWe 压水反应堆机组,核岛和常规岛设备分别由法国法马通公司和英法通用电气—阿尔斯通公司供应,建设阶段的总体技术责任由法国电力公司承担。1987年8月7日工程正式开工,
Guangdong Daya Bay Nuclear Power Station is located along the scenic Daya Bay, with a straight line distance of 45 kilometers from Shenzhen and about 50 kilometers from Hong Kong. Daya Bay Nuclear Power Station is a large-scale commercial nuclear power plant with the introduction of foreign capital, equipment and technology. It is a product of China’s reform and opening-up policy. It is the result of the solidarity and cooperation between Guangdong and Hong Kong and is also the result of Sino-foreign cooperation. The nuclear power plant installed two 984MWe pressurized water reactor units with single capacity, nuclear island and conventional island equipment were supplied by French Famatong Company and British General Electric - Alstom, respectively, and the overall technical responsibility in the construction stage was borne by the French power company. On August 7, 1987, the project officially started.