论文部分内容阅读
沂沭泗河洪水东调南下调度方案初探米佩苓(山东省水利勘测设计院)经国务院批准,沂沭泗河东调南下工程正式复工。工程实施后的管理调度是最大限度地发挥工程效益的重要技术手段。对此,进行了初步探讨。1沂沭泗流域概况及东调南下工程规划思想沂沭泗河是淮河下游的主要...
Yishusi River flood eastward transfer plan for the first time in the South Mi Peiling (Shandong Province Water Conservancy Survey and Design Institute) approved by the State Council, Yishusi East River transfer project south of the official resumption of work. After the implementation of the project management and scheduling is to maximize the engineering efficiency of the important technical means. In this regard, conducted a preliminary discussion. 1 Yishusi catchment profile and the eastern part of the south of the river project planning thinking Yishusi River is the main Huaihe River downstream ...