论文部分内容阅读
8月21日至24日,基建局召开了设计院院长座谈会,座谈设计质量检查方面的问题。会前,基建局先后听取了各院关于近一时期设计质量检查情况的汇报。座谈会根据汇报对当前设计质量检查工作的情况和特点作了分析,肯定了前一时期所取得的成绩。探讨了存在的某些问题,并就今后进一步开展质量检查的作法交换了意见。从各院的汇报来看,杭州会议以后,设计质量检查工作大体上经历了两个阶段。第一阶段,年初到3、4月间,各院普遍发动群众对所有已经施工、正在施工和即将施工的项目作了检查。检查出来的问题,一般也都作了处理:该修改的设计修改了,该补发的图纸补发了。这一时期着重检查主体结构的安全问题。5月以后为第二阶段。在此期间,各院都根据优质高产的号召开展了以提高设计质量为中心的整顿生产秩
From August 21st to 24th, the Infrastructure Construction Bureau convened a meeting of the dean of the Design Institute to discuss issues related to design quality inspection. Before the meeting, the Infrastructure and Construction Bureau heard reports from the institutes on the status of design quality inspections in the near future. According to the report, the forum analyzed the situation and characteristics of the current design quality inspection work and confirmed the achievements made in the previous period. Some of the problems that existed were discussed, and opinions were exchanged on ways to further carry out quality inspections in the future. Judging from the reports of the hospitals, after the Hangzhou conference, the design quality inspection work has gone through two stages. In the first phase, from the beginning of the year to March and April, the institutes generally launched mass inspections of all projects that have been under construction, under construction, and are about to be constructed. The problems that have been checked out have generally been dealt with: the revised design has been revised and the reissued drawings have been reissued. This period focused on checking the security of the main structure. After May is the second stage. During this period, the hospitals have organized and rehearsed production ranks based on high-quality, high-production numbers to improve design quality.