大型钢结构构件的质量较大,在安装过程中一般采用脚手架多层回顶的方法。假设各层混凝土楼板平均分担钢构件传递的临时支撑荷载,这对于大跨度混凝土楼板可能带来安全隐患。结合实际工程实例,对超高层大型钢结构转换桁架不同的临时支撑方案进行了研究,分析了混凝土楼板和回顶脚手架的受力状态,提出了可能出现安全隐患的情况,给出了采用转换钢地梁的解决办法。结果证明是安全、经济有效的。
Large-scale steel components of greater quality, the installation process generally used scaffolding multi-layer back to the top of the method. It is assumed that the concrete slabs on all floors share the temporary support load transmitted by the steel members equally, which may bring potential safety hazard to the long-span concrete floor. Based on the practical engineering examples, the different temporary support schemes for the truss of the high-rise large-scale steel structure conversion truss are studied. The stress state of the concrete floor and the back scaffold is analyzed, the potential safety hazard is presented, Ground beam solution. The results prove to be safe and cost-effective.