论文部分内容阅读
1995年9月6日,由福州大学、福建省水电设计研究院等单位的7名专家,对大田县蕉坑水电站进行现场测试和审查提交的异步电机并网发电研究各有关资料、技术文件认真评议,一致通过省级鉴定。该科研项目由大田县水电局、福建省农电局及三明市水电局共同完成。用异步电机并网发电,结构简单,省去最复杂、故障最多的励磁系流,操作并网容易,可靠性高,运行稳定性好,投资较省,便于实现无人值守。通过不断强化电网建设和电容器无功补
On Sept. 6, 1995, seven experts from Fuzhou University, Hydropower Design and Research Institute of Fujian Province carried out on-site testing and review of the submitted information on grid-connected power generation of asynchronous motors submitted to Dakeng County’s Naokeng Hydropower Station, earnestly studying technical documents Comments, unanimously passed the provincial appraisal. The research project by the Datian County Hydropower Bureau, Fujian Provincial Bureau of Agriculture and Sanming City Department of Water completed. Asynchronous motor grid-connected power generation, simple structure, eliminating the most complex, most fault excitation system flow, the operation of the grid easy, high reliability, good running stability, investment more provincial, easy to achieve unattended. Through continuous strengthening of power grid construction and capacitor compensation