大峡水电站初步设计中重点研究的几个问题

来源 :西北水电技术 | 被引量 : 0次 | 上传用户:adonis77
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
大峡水电站位于甘肃省兰州市皋兰县和榆中县交界的黄河干流上,是龙羊峡至青铜峡河段梯级规划的第11个梯级。距兰州市中心河道距离65公里。坝址处多年平均流量1030米~3/秒。主要出露地层为前寒武系结晶片岩,致密坚硬,风化较浅,完整性好,透水性小,断裂结构规模不大,缓倾角结构面不太发育,裂隙中夹泥很少。地震基本烈度为七度。 Located on the main Yellow River at the junction of Gaolan County and Yuzhong County, Lanzhou City, Gansu Province, Daxia Hydropower Station is the eleventh step of the cascade plan from Longyangxia to Qingtongxia. Lanzhou city center from the river distance 65 km. Dam site for many years the average flow of 1030 m ~ 3 / sec. The main exposed strata are Precambrian crystalline schist, which are dense and hard, have a low degree of weathering, good integrity, small water permeability, small scale of fracture structure, less developed surface of gentle dip angle and little mud in cracks. The basic earthquake intensity is seven degrees.
其他文献
2006年5月24日,国家发改委再次上调国内成品油价格,汽油、柴油及航空煤油每吨上涨500块钱人民币。这是今年以来油价的第二次上调,也是近一年来油价调整幅度最大的一次。
以一种"赌命"的姿势失去平衡.以一种什么样的人生观(请原谅用"人生观"这样的陈旧的词,它最恰当)从事商业,恰是导致一个国度的经济与另外一个国度的经济不同的最终分野所在.
伴随社会主义市场经济的快速发展和企业改制重组的不断深化,越来越多的企业和企业家,高度关注企业变革重组中文化的变革与重组.企业文化已经成为企业改制、建立现代企业制度