本文从“三超”以及投资浪费现象严重、当前电力工程造价与市场状况严重脱节、电力工程设计发生的临时变更较频繁以及工程造价控制水平参差不齐四个方面概述了当前电力工程造价控制中存在的问题以及成因,重点探讨了当前电力工程造价控制中应该着重把握的问题及对策,包括推行限额设计原则、推行ISO9000系列质量管理体系、对设计单位经济责任制进行建立健全、加大对工程设计人员的管理力度、对电力工程设计监理制度进行全面推行、实现国家以及电力部门造价专业信息网络的建立健全以及针对各项造价指数进行定期的公布等。
This article summarizes the current construction cost of electric power project from four aspects: “three super ” and the serious waste of investment, the current serious disjunction between the cost of power engineering and the market condition, the temporary change of power engineering design, and the uneven control of construction cost The problems and their causes in the control are discussed emphatically. The problems and countermeasures that should be emphasized in the current control of the cost of power engineering are discussed in detail, including the implementation of the principle of quota design, the implementation of the ISO9000 series quality management system, the establishment and improvement of the economic responsibility system of the design unit, Management of engineering design personnel, the full implementation of the power engineering design and supervision system to achieve the establishment of national and electricity sector cost of professional information network to establish and improve, as well as for various cost index for regular publication.