【摘 要】
:
随着经济的发展,对水资源需求的紧迫性逐渐显露。最近,南水北调三种方案的讨论已提到议事日程上来。其中有关南水北调东、中线方案开展讨论较早,研究工作也较细。西线方案的
【机 构】
:
长江水资源保护科研所上海分所 上海 200120
论文部分内容阅读
随着经济的发展,对水资源需求的紧迫性逐渐显露。最近,南水北调三种方案的讨论已提到议事日程上来。其中有关南水北调东、中线方案开展讨论较早,研究工作也较细。西线方案的讨论近期也开展了。1998年5月11日上海《文汇报》刊登了记者采访黄河水利委员会勘测设计研究院南水北调西线工程项目设计总工程师谈英武,报道了西线方案初步
With economic development, the urgency of water demand gradually revealed. Recently, discussions on the three options for the South-to-North Water Diversion have been mentioned on the agenda. Among them, discussions on the east and middle routes of the South-to-North Water Diversion Project were held earlier and the research work was also finer. Discussions on the Western Line program have also taken place recently. May 11, 1998 Shanghai Wen Wei Po published an interview with Ying Yingwu, Chief Engineer of Design of West Route Project of South-North Water Diversion Project, Design and Research Institute of Survey and Design, Yellow River Conservancy Commission.
其他文献
1999年8月11日洋河流域突降特大暴雨,超标准洪水造成洋河多处决口和巨大的经济损失。河道治理必须适应和满足经济发展的要求,合理确定防洪标准,坚持统一规划、综合治理的原则
政治西藏民主改革的回顾与研究(下) 郭冠忠《西藏研究》1998.3谈市场经济条件下的西藏地方立法姚俊开《西藏民族学院学报》1998.2、3合刊西藏实况:撇开神话与谎言,重新认识中
为配合万博集团“博雅庭韵”工地的修建,成都市文物考古研究所金沙遗址工作站于2002年6月下旬开始对该工地进行考古勘探和发掘,至2003年5月结束,发掘面积7550平方米。万博地
Application of 5-10 mg L-1 water soluble anionic polyacrylamide (PAM) to furrow irrigation water during flow advance substantially reduces sediment loss and inc
文章介绍了高水头多泥沙河流上的马鹿塘电站,在初步设计中选用的水轮机中拆检修方案,并对下拆及中下拆水轮机检修方案的优缺点进行了分析、对比。
This paper introduces the
1 工程概况 冶源水库总库容2.03亿m~ 3,主坝长650m,最大坝高27.3m,为粘土心墙砂壳坝。主河槽为第四纪砂夹砾石覆盖层,厚约9m,基岩为白垩纪凝灰角砾石和火山角岩。基槽开挖至
回顾与展望——那不勒斯国际费希特会议闭幕词〔德〕R.劳特李文堂译〔译者按〕1995年4月26日至29日,国际费希特研究协会在那不勒斯举行了第三届大会。协会主席R.劳特教授在会上发表的这篇闭
1 工程概况山西省万家寨引黄工程联接段汾河水库取水工程是中国水利水电第五工程局承建,于1998年8月18日开工,总工期28个月。该工程包括汾河水库内进水塔一座、竖井、坝下隧
由上海市水文总站阮仁良主编的《上海市水环境研究》一书由科学出版社于2000年4月出版。本书主要以上海市水文总站(上海市水环境监测中心)在90年代的大量研究成果为基础,结
社会科学也是第一生产力,社会科学研究成果与自然科学研究成果一样,可以转化为现实生产力。社会科学成果的转化过程可分为三个阶段:1.成果为社会所了解;2.成果为社会所接受;3