2003年8月的一天,云南红河洲政府重点投资的一家水电站即将正式投产,领导剪彩的日子已经没有几天了,突然发现水力发电机组还缺几个零件,整个工程面临着延期投产的危险.工程指挥部的领导很着急,这些设备的供应商,广东韶关众力发电设备有限公司的销售部门也同样吓出一身冷汗:这样的水电项目一般都涉及到移民、防洪、发电等多个方面,是当地政府的一项重大工程,如果不能按期投产,不但这个单子的货款危险,以后能否在这个地区甚至整个云南省开拓
One day in August 2003, a hydropower station heavily invested by the government of Honghe Prefecture in Yunnan Province was about to officially put into production. It has been a few days since the day it led the ribbon-cutting project. Suddenly, it found that hydropower units still lacked several parts and the entire project was in danger of being put into operation for a long time. The head of engineering headquarters is in a hurry, the sales department of suppliers of these equipments and Guangdong Zhongguancun Power Equipment Co., Ltd. also scared a cold sweat: Such hydropower projects generally involve many aspects such as immigration, flood control and power generation, Is a major project of the local government, if not on schedule, not only the risk of payment of this list, the future can be opened up in the region or even the entire Yunnan Province